① It is a nice circular-shaped project;
② The vast majority (more than 95%) of the forms can be re-used for straight walls, saving much cost for customer.
① GETO aluminum template was delivered to Djibouti which marked GETO’s first entry into the African market;
② GETO provided three sets of aluminium formwork system to customer to complete 2600 single floor villas;
③ GETO’s formwork has made a deep impression on customer, because it indeed saved much cost and time for them.
① This is a project applying tunnel formwork to housing project;
② Formwork was not required to split into pieces, but totally dismantled and transfered to next storey by crane;
③ It is a way to leave out installation when formwork is applied to other storey or building.
① The COFICO project is GETO first apartment project in Argentina;
② There are 19 floors with 2.8m floor hight that Geto recommended customer to use refurbishment service, which helped customer to save much cost;
③ The customer was very satisfied with GETO’s scheme.
① La Juana is the first biointelligent neighbourhood in Uruguay;
② This is a typical project of aluminum formwork combined with hollow plastic Formwork;
③ GETO provided the comprehensive solution scheme for customer: the vertical structure of GETO aluminum formwork + GETO props + the hollow plastic formwrok provided by GETO to do the roof and parapet scheme for construction;
④ The aluminum formwork quality was recognized by the customer.
① According to the customer’s early budget, GETO offered the solution that only one set of aluminum formwork is required, and then it is transferred to other floors for use.
② In the design stage, by repeatedly communicating with the customer, customer finally confirmed the number of aluminum mold turnover and the mold drawing.
① The project has four districts. GETO provided one district formwork to customer, and helped customer to reuse those formwork to other districts and floors;
② The reusing service of GETO maximized the utilization rate of the aluminium formwork, which helped customer to save much cost.
① GETO provided precast columns to customer which were built with GETO aluminium formwork;
② Those columns used precast beamless structures and seismic isolation system;
③ By using those columns to complete residential buildings, it improved the seismic performance of the buildings and reduced casualties and property damage.
① It’s a formwork rental business in local market, and also is the first application try of aluminium formwork;
② Aluminum formwork was not widely applied when sale director brought GETO’s aluminum formwork to UAE in 2017, but now GETO aluminum formwork is widely accepted by customers in the market.
③ With comprehensive competitive advantages, Aluminum column/wall formwork has become the most popular product in local construction industry.
① With belt and road Initiative, GETO always follow up China construction company steps in oversea market. JKT Living Star is the first project that GETO cooperated with China construction company in Indonesia;
② With strictly quanlity controlled, the project has made good finished, the wall flatness within 3mm;
③ Customers were very satisfied with our aluminium formwork products and services.