The International Arbor Day and GETO aluminium assembly building formwork


The March 12th is a special day--The International Arbor day. More and more countryies are pay much attention to the environment once the increased of global temperature. Some countries already promotes and protects trees by law, and encourage people to participate in activities that involve afforestation. According to the length of time, the arbor day can be divided into tree-planting day, tree-planting week or tree-planting month, collectively known as the International arbor day. Through this activity, people are encouraged to love and protect the environment.



blob.png


In this vibrant March of spring

The annual Arbor Day quietly arrives

I believe that many people will plant a sapling today

However, the significance of Arbor Day

 is to encourage us to love trees and protect the environment and spread environmental awareness.


In addition to afforestation,

You can also start with green building materials to practice environmental protection.

Green assembly building will become a new trend system in the development of the architectural industry.


The advantages of assembly building formwork system


1) Building houses as like building blocks, including facade construction, one-time molding, reducing construction time.

2) Reduce costs, construction waste, building site dust and pollution.

3) The room layout and flexible structure, which can create a full cycle apartment.


blob.png


Nowadays, green, recycling and low-carbon development is the main contents of developing assembly building model in construction industry, also is an important measures for steady growth, reform and structural adjustment. It is also a new era of real estate developer and the best choice.

Using GETO aluminium formwork can let real estate developer&construction company feel “Confortable, easy and rest assured”.


blob.png



Compared with traditional timber formwork, the use of aluminium formwork can eliminate the plastering process, thereby reducing the use of cement, mortar, and water in the building process, which achieving energy conservation and reducing energy consumption.


blob.png


The collected data shows that after the construction of the aluminium formwork, the plastering process is not required for the wall, and the thickness of the floor, the levelness of the ceiling, the verticality, the flatness and other indicators can be closed to nearly 100% qualified level.


blob.png


After the aluminium formwork is used, no plastering is required. After the surface treatment of the concrete wall column is cleaned, the decoration process can be carried out directly after the partial treatment.


blob.png


The advantages of GETO aluminium formwork

1)Reusable, aluminum formwork can be reusabled more than 300 times.

2)The use of aluminum alloy formwork assembly, good stability, high bearing capacity.

3) Integrated design, early demolition technology integrated into the roof support system, improve the reused time.

4) Aluminium formwork support rods are relatively reduced, and the on-site operation space is large, the material handling is convenient, and the on-site management efficiency is greatly improved.

5) After the aluminium panel is removed, the surface quality of the concrete is smooth, achieving the effect of decorative surface water concrete.