How could I become your agent?
GETO attaches great importance to the development of the global market. We also welcome product agents who have the strength and willingness. Please contact us for more details.
Whether your products have relevant certificates?
Our products have the ISO 9001:2015 quality management system certificate, ISO 14001:2015 environmental management system certificate, ISO 45001:2018 occupational health and safety management system certificate and other qualifications, we can provide relevant certificates.
How does GETO ensure product quality? What are the specific measures?
Our company carries out the quality management requirement of the group company. We ensure the quality of raw materials at the source, record the whole production process, and establish the reward and punishment institution to ensure product quality.
How about GETO’s storage and turnover capacity? If our order quantity is very large in the short term, how can you deliver the goods on time and in quantity?
GETO has 11 production bases in total with 5,000,000㎡ total production capacity. It prioritizes overseas projects and guarantees the delivery date of contracts. Meanwhile, overseas projects would arrange the most nearest production base to shorten the delivery time.
Has GETO done any projects overseas?
GETO currently has done projects in over 30 countries around the world.
Is GETO a factory or a trading company?
GETO is an A-share listed company specializing in the production, sales, trade, and service of aluminium formwork and self-climbing platform.
How many times the aluminium formwork is reused that it will cost less than timber formwork?
Aluminium formwork is used in buildings whose standard floors are more than 20 floors that the overall cost is lower.
What is the labor cost comparison between aluminium formwork and timer formwork?
Using aluminium formwork can save about 35% labor costs compared with timer formwork.
Does it need the experienced aluminium formwork installed workers?
Aluminium formwork is a standardized product and can be installed according to the drawings. Each panel has its own number that workers can find the related panel easily. It only needs a simple explanation for workers before installation.
Will the concrete pile up on the formwork after the formwork is used many times?
If the operation is carried out with construction standards, the demoulding agent is used with the provisions, and we will do a simple cleaning after each panel is used, this situation will not occur.
Does it need post-processing of the water and electricity pressure slots to use aluminum formwork?
No, we can make pressure slots on the formwork according to your water and electricity drawings to reduce the workload of secondary construction.
How do you deal with the stairs?
The staircase is also a whole moulding. In the pouring process, it can separate a few times to cast by opening a hole or opening part of the stair cover panels to make the higher quality staircase molding.
What are the supply steps and lead time of the self-climbing platform?
Normally, for 40 machine positions, it takes 10 days for deepening design, 35 days for production, 7 days for transportation, loading and clearance of goods, a total of about 52 days. The shipping time is determined according to different port’s and shipping company’s shipping schedules.
What is the spacing between the self-climbing platform and the construction structure?
The standard spacing is 400mm.
Can the GETO self-climbing platform lift in more than two zones?
Yes, we adapt an electric hoist self climbing platform which only needs to divide into 1-2 zones to lift.
I bought the aluminum formwork from other companies, can I use your self-climbing platform?
No problem. In the deepening design stage, our technical team will contact your aluminum formwork supplier to ensure that the two systems can be used together.
Using the GETO self-climbing platform, can I decorate the facade during the climbing process?
Yes.
What is the lifting speed of the self climbing platform?
Lift 12cm in one minute.
How about the effect of the concrete surface made with aluminium formwork?
After dismantling the aluminum formwork, it can achieve the effect of fair-faced concrete. The wall is smooth, the vertical flatness is 3mm-5mm, and there is no need for plaster.
Will there be aluminium formwork deformation or burst?
If you install with the construction standard, workers do not dismantle the formwork violently, there will not occur the situation of formwork deformation and burst. Before casting concrete, workers must check the reinforcement device.
Why do the dirt spots appear on the surface of aluminium alloy formwork?
In the process of aluminium and aluminium alloy production and utilization, partial blackening and corrosion may occur after the materials undergo surface cleaning, storage, metal casting and other processes. According to the SGS test, the aluminium alloy with dirt spots is almost the same as the aluminium alloy without dirt spots in terms of the element ratio of the material composition, and the mechanical properties of the material. The sole difference is in its appearance which will not affect the quality of the material and the concrete outcome quality.
Why does the powder of the powder coating aluminium alloy formwork come off?
Customers can choose powder coating treatment on the surface of aluminium formwork to reduce the oxidation phenomenon of aluminium formwork. But due to the differences in actual usage on site, the powder coating aluminium alloy formwork has the risk of powder coming off. However, it will not affect the quality of the material and the concrete outcome quality.
What is the thickness of GETO aluminium formwork?
Generally, it is 4mm, and the link part is 6-8mm.
What is the law material of GETO aluminium formwork?
Aluminium alloy 6061-T6.
What is the average weight of GETO aluminium formwork?
It is 60KN/㎡.
What are the dimensions of the aluminium forwork?
Aluminum formwork is a customized product. The maximum width of a single panel is 600mm, the minimum is 50mm, the maximum height is 2.4m, and the hole spacing standard is a multiple of 50mm.
How many times does the GETO aluminium formwork can be used?
The official figure is 300 times, and according to GETO’s experience, it can be used about 200 times.
What kind of project is suitable for using aluminum formwork?
Aluminum formwork is a new material to replace the traditional formwork. It is suitable for all kinds of ordinary houses, villas, high-rise office buildings and a series of modern buildings. As long as the standard floor is more than 20 floors, we recommend you to use aluminum formwork so that the overall cost is lower.
What structural parts of buildings can GETO aluminium formwork be used in?
GETO would customize the aluminum formwork according to the special structures of different building projects, and mould all structures in the building at one time, including: walls, columns, beams, roofs, staircases, balconies, door frames, windows and various structural pressure slots.
What are the priorities for using aluminum formwork?
Construction efficiency and average cost.
Can some large-size column structures use GETO aluminum formwork?
Yes, the tie rod system will be used for columns over 1.2m.
Can GETO aluminium formwork be used with aluminium formwork of other brands?
As long as your aluminium formwork belongs to the type of 65mm or 63.5mm edge banding height, it can be used with GETO aluminium formwork. Before the transaction, we will arrange the deepening design engineer to see your existing aluminium panels, to assist you to in maximize the use of the existing aluminium panels, and to provide you with customized aluminium formwork design service.
Can GETO aluminium formwork be used with timber formwork?
Yes, GETO can provide a full set of aluminium formwork systems, all structures of the whole project can use aluminium formwork. However, in some special parts, where the use of formwork is rare, we recommend using timber formwork. The combination of aluminium and wood can save your costs.
Can GETO aluminium formwork be used with prefabrication?
Yes, aluminium formwork can be combined with prefabrication. GETO would offer design plans according to the project.
What kind of aluminum formwork accessory systems do you have?
Fromwork system, support system, reinforcement system, and accessory system.
How many sets of props does it need?
Generally, aluminium formwork’s average construction speed is 4-5 days on each floor, it needs 2 sets of props. If the construction speed is faster, three sets of props are recommended.
Does GETO provide embedded flat ties?
GETO can provide embedded flat ties and reusable flat ties. According to the project needs and your preferences, you can choose which one to use. For example, a wall thickness which is less than 350mm can use a reusable flat tie, which is more than 350mm is more suitable for an embedded flat tie. If there is a waterproof requirement, an embedded flat tie will be recommended.
How do you deal with the water and electricity box?
With the same treatment as the traditional wooden formwork, the pipeline wire box is embedded and bound to the steel bar, or punched in the formwork fixed.
What are the terms and methods of payment?
We support the payment methods of telegraphic transfer or letter of credit. The payment terms are a 30% deposit within 7 days after signing the contract and a 70% balance before delivery.
How can you guarantee the security of the remittance?
Our receiving account is a Chinese state-owned bank with an endorsement of the Chinese government and an official qualification guarantee to ensure safe transactions.
How much is the aluminum formwork?
We provide the quotation according to the project drawings, you can contact us for inquiry.
After purchasing the aluminum formwork, do I need to purchase additional accessories?
The quotation includes the accessories required for construction and the tools used for construction, and the iron accessories which are easy to wear will be added according to a certain loss proportion, such as pins, wedges, flat ties and tie sleeves, etc. However, customers need to prepare the demoulding agent used in the installation process.
Can I only buy some standard plates?
Of course, please contact us with your specifications and quantity so that we can offer you the best price.
Could you provide samples?
We can provide the sample required by customers, please contact us.
What is the spacing between the self-climbing platform and the construction structure?
The standard spacing is 400mm.
Can the GETO self climbing-platform lift in more than two zones?
Yes, we adapt an electric hoist self-climbing platform which only needs to divide into 1-2 zones to lift.
I bought the aluminium formwork from other companies, can I use your self-climbing platform?
No problem. In the deepening design stage, our technical team will contact your aluminium formwork supplier to ensure that the two systems can be used together.
Using the GETO self-climbing platform, can I decorate the facade during the climbing process?
Yes.
What is the lifting speed of the self-climbing platform?
Lift 12cm in one minute.
What are the supply steps and lead time of self-climbing platform?
Normally, for 40 machine positions, it takes 10 days for deepening design, 35 days for production, and 7 days for transportation, loading and clearance of goods, a total of about 52 days. The shipping time is determined according to different port’s and shipping company’s shipping schedule.
How to ensure safety when workers use the self climbing platform in some frequent thunderstorm areas?
The GETO self-climbing platform has a lightening protection system and electric control system. Lightning protection system: on the top layer of the self-climbing platform, a lightning rod is installed. Inside the frame, the frame and structural equipotential line connect to the grounding wire connecting to the floor. Electric control system: all electric control wires are installed in the trough to prevent rainwater soak.
How to judge the service life of the self-climbing platform?
It can be judged from 4 parts: frame system, electric control system, attachment support system, and lifting system.
Frame system: the deformation degree of the walkway plate, protection net and poling is in a reasonable range after the removal, and the screw thread can continue to be used after the removal of the screws.
Electrical control system: the main control box operates normally, and the readings of the sub-control box are normal; Wires and plugs are free from moisture and damage.
Attached support system: double torsion spring and swing needle tension spring are not deformed; the top supporter, splint, and swing needle are normal.
Lifting system: The electric hoist is normal, with no damage to the chain; The upper and lower hangers have no cracking phenomenon and the bending degree is in a reasonable range. The load sensor has no longitudinal bending and the figures display function is sensitive.
How many specifications of the protective net?
7 main specifications: 2500mm, 2000mm, 1500mm, 1000mm, 700mm, 600mm, 500mm, protective net height is 1500mm.
GETO self-climbing platform is used in an electric hoist system or hydraulic system?
The lifting system of the GETO self-climbing platform is an electric hoist. There is a master control box to control the lifting stability of the frame. Its convenience and safety are better than those of hydraulic systems.
Will there be a situation that the formwork cannot be installed after arriving at the site?
Our design system is GETO-BIM automatic modulation software with the function of automatically checking erection errors to ensure a 100% accuracy rate. At the same time, we can pre-assemble in the factory before delivery to ensure that each piece of formwork can be used normally. If the formwork can’t be installed on-site, we will check the process of design and production immediately. If there is any mistake, we will immediately reissue related materials to you and provide a alternative plan.
How to guide customers to erect during the COVID-19 pandemic?
We offer online instruction by a professional project supervisor.
Can you provide technical guidance after purchasing the product?
We can provide technical guidance services, but the specific service content is according to the project schedule to decide. In principle, we provide technical guidance for no more than a month or a standard floor.
Unskillfully workers who use aluminum formwork for the first time will affect the erection schedule?
Aluminum formwork is different from wooden formwork, which requires experienced workers. Aluminum formwork is a standardized product and can be installed according to the drawings, which is as easy as stacking blocks. At the same time, GETO will arrange guidance personnel for a technical explanation before erection, and will guide workers on-site for one month.
Can we use the existing panels for the later project?
Yes, according to your new project drawings and your existing panels, we will redesign and use the existing panels, and reissue some new panels. Geto maximumly reduces your budget.
What are the basic steps for the refurbishment of existing panels?
Existing panels recycling/Existing panels refurbishment/Sorting into storage/Existing panels requisition
Will there be a longer delivery time for small orders?
For small orders, according to the contract time to delivery is the same as for other orders.