Integrated Services of Aluminium Formwork and Self-Climbing Platform-GETO
What Are the Advantages of Integrated Services of Aluminium Formwork and Self-Climbing Platform?
GETO, an aluminium formwork company, combines the advantages of aluminium formwork system and self-climbing platform system and commits to providing high-quality comprehensive service.
Advantage 1: Integration of Sales and Customer Service
One-time completion of business negotiation for aluminum formwork system and self-climbing platform system orders of one project, with combined enquiries for both product systems answered, making the communication flow concise and efficient.
One-time understanding on similar lead time and integrated installation method of the aluminum formwork system and the self-climbing platform system.
Reduce the client’s travel time to the factory and the construction site for separate site inspection, and simplify the overlapping procedures of multiple-time approval, payment, and financial settlement that occur among the two product systems, increasing the collaboration efficiency.
Advantage 2: Integration of Design and Detailing
In combination with the main structure, the conflicts between the external walls of the aluminium formwork and the self-climbing platform and the reservation of the pre-buried holes of the self-climbing platform system are fully considered.
Modulate all-dimension design and detailing solutions that take care of both internal and external parties of the project in service, contributing to the prevention of on-site conflicts regarding the aluminium formwork construction and the self-climbing platform system sets supplied.
Advantage 3: Integration of Production and Project Management
Production and supply of the aluminium formwork system and the self-climbing platform system are conducted by one factory, with intensive production in place to reasonably match the expected time to produce orders. Materials of the aluminium formwork system and the self-climbing platform system for one project are delivered to the site at one time, and the factors of working progress and unloading sites are reasonably considered on the construction site in the overall delivery plan. Real-time tracking of the production progress of the aluminium formwork and the self-climbing platform system at one time, realizing flexible adjustments during production, and on-time fulfillment of the production system.
Advantage 4: Integrated On-Site Engineering Services
One-time completion of shell drawing designs, construction, and technical and safety briefing on the GETO aluminium formwork system and the GETO self-climbing platform system. Technical instruction service for both the aluminium formwork system and the self-climbing platform system at one time, with the site instructor with relevant professional knowledge to service the two product systems on one project site, reducing the on-site communication costs. From the first level to the top level, one-stop engineering service for the entire project.
Advantage 5: Centralized On-Site Project Management
All enquiries regarding the aluminium formwork system and the self-climbing platform system are managed by one particular person in charge, preventing possible miscommunication caused by multi-level management. For material management and site instruction needs of the aluminium formwork system and the self-climbing platform system, there will be one-time solutions by on-site coordination. Effectively coordinate the labours for the aluminum formwork system and the self-climbing platform system on site, preventing conflicts among labours to achieve effective teamwork and resource sharing.
Advantage 6: Integrated Goods Return and Recycling Service
Centralized arrangement of goods return and recycling of the aluminium formwork accessories and the self-climbing platform system, trucks loading collectively and exiting the site in a speedy mode. The person in charge of goods recycling checks the inventory details of the aluminium formwork system and the self-climbing platform system at the same time, communicates with the main contractor for double-check purposes, organizes and guides packing and truck loading, and completes the recycling of both product systems at one time. By the information-based statistics of materials exiting the site, guarantee the material amount of site entry and site exit are consistent with each other, preventing possible customer conflicts with clear responsibilities.
Advantage 7: Save Cost by Collective Quotation
- Save financial cost of the main contractor to travel between the aluminium formwork factories and the self-climbing platform system factories multiple times.
- Save time cost of the main contractor to travel between the aluminium formwork system factories and the self-climbing platform system factories multiple times.
- Save communication cost for the main contractor to connect with the aluminum formwork system factories and the self-climbing platform system factories separately.
Advantage 8: Save Collective Project Cost
- Save technical labor costs for the main contractor, as they no longer need to deal with technical personnel for two types of product systems separately at the early stage of construction.
- Save labor costs for the main contractor to manage two types of product systems separately during construction.
- Save time cost for communication and coordination during the customer journey of the main contractor.
Advantage 9: Save Cost for Main Contractor Management
- Reduce worries: Professional technical briefing and labour training in one shot.
- Save time: Issues related to design, production and technical terms solved on time.
- Save energy: One person in place to solve issues of the aluminium formwork system and the self-climbing platform system at one time.
Please feel free to contact us to get the service you want. Click on the page to know more about geto product and service.
Published: July 17, 2022
Last published: June 30, 2022