① The GIA Tower is GETO first climbing system project in oversea market and Cambodia;② The main difficulty of this 43 floors office building project is to optimize the self-climbing platform structure…
① The first successful trial of video technical guidance under the background of covid pandemic lockdown;② The first time of client’s labor team working with aluminum formwork;③ The first time collaborating with client’s BIM technical team…
① The project has received full attention in Hongkong, China and also is GETO’s first application try of station cover project;② GETO provided flat tie system for this project and accumulated a…
① This is a very nice Butterfly-shaped project which means that the project is very complicated;② It is not only structural changes between floors, but also a lot of circular arcs;③ GETO enabled…
① It is a mirrored structure, and butterfly-shaped with a lot of circular arcs;② Multiple structure changes between floors that formwork reutilization has to be considered for all floor changes;③ As required by…
① In adherence to the industrialization of construction industry concept proposed by Singapore Government, GETO and its regional partner collectively developed innovation in crafting PPVC precast system;② This innovation classified the rooms…
① Precast systems are widely used, averagely 70% by volume of the entire structural concrete used during the construction stage;② The main challenge is shell optimization to ensure accurate connection joints between…
① Differently arranged cantilevered balconies are projected outwards up to 4.2 meters;② The structure of the project has many arcs;③ GETO provided a complete formwork solution for walls, columns, slabs, staircases, elevator shafts…
① The project has podium and typical floors. There is a great difference in terms of structural design and floor height between podium and typical floors in a tower;② GETO offer one…
Project Requirements: The towers look like several flower petals dropped in the cloud and mist of the mountain. Project Structure: A collection of round columns, arc-shaped beams and unique-angled decks…
① It is the first project in Malaysia that utilized aluminium quick-deck system of GETO to construct its podium part;② For construction projects that consist of huge and flat structure without beams,…
① Based on the project characteristics of terrace house project and the client’s budget, GETO offer customized aluminium formwork system turnover solution for clients;② GETO proposes technical solution for aluminium formwork system…
① For a tower with two types of typical floor design, GETO’s solution is to offer one set of aluminium formwork system for reuse and turn over throughout the tower;② GETO equips…
① It is a landmark project consists of 2 towers with complex and changing structures;② GETO offered aluminium formwork system with all building details, including positioning of electricity boxes and pipelines, exterior…
① By offering integrative design of aluminium formwork system and self-climbing platform system, GETO can contribute to improve the efficacy of structural work progress for superhigh skyscrapers and ensure the safety…
Office address: BLK 808 French Road #04-157 Kitchener Complex, Singapore Responsibilities:1.Responsible for technical support to construction site;2.Able to coordinate & resolve customer problems;3.Able to multi-task to support warehouse operation when…
Office address: 5 Gul Street 1, #01-03 Singapore 629318 Responsibilities:1.Responsible for daily warehouse operation;2.Prepare Stock In/Out Report, Detail Packing List, Stock Details List, D/O etc;3.Assist to control stock in and…
Office address: BLK 808 French Road #04-157 Kitchener Complex, Singapore Responsibilities:1.Responsible for all technical drawings, 3D modelling and documentations;2.Prepare CAD Drawings and BIM models;3.Ensure all structural drawings & specifications are…
Office address: Second Floor, No.1-2, Jalan Anggerik Vanilla BF 31/BF, Kota Kemuning, 40460 Shah Alam, Selangor, Malaysia Responsibilities:Assist the Sales Manager to complete the routine affairs of the sales department;Establish,…
Office address: Second Floor, No.1-2, Jalan Anggerik Vanilla BF 31/BF, Kota Kemuning, 40460 Shah Alam, Selangor, Malaysia Responsibilities:Provide technical support and service to customers and constructors related to company products.…
Office address: Lot 143-145, Jalan Permata 1/5, Arab Malaysian Industrial Park, 71800 Nilai, Negeri Sembilan, Malaysia. Responsibilities:1.Organize production activities according to the production plan, and complete production tasks with quality…
Office address: Lot 143-145, Jalan Permata 1/5, Arab Malaysian Industrial Park, 71800 Nilai, Negeri Sembilan, Malaysia. Responsibilities:Organize and implement company’s production plan, manage and supervise production system to achieve production…
Office address: Lot 143-145, Jalan Permata 1/5, Arab Malaysian Industrial Park, 71800 Nilai, Negeri Sembilan, Malaysia. Responsibilities:Manage and supervise production system, responsible for logistics and data management to achieve company’s…