The Trion-BLK#C@Binastra, Malaysia

429

① For a tower with two types of typical floor design, GETO’s solution is to offer one set of aluminium formwork system for reuse and turn over throughout the tower;
② GETO equips its self-developed 3D BIM System to do automatic formwork modulation, correction and design. The integration of top-notch technology has made the formwork system design to reach the standard of no physical aluminium formwork mockup needed;
③ This outcome can facilitate our client to save construction cost, and improve the smoothness of construction progress on sites.