Project Requirements:
The towers look like several flower petals dropped in the cloud and mist of the mountain.
Project Structure:
A collection of round columns, arc-shaped beams and unique-angled decks are combined to form the towers in the project, with very special structures consists of over 50% of special-shaped formwork in its aluminium formwork sets as designed.
Advantages of the GETO Project:
It utilized its error-free 3D BIM Formwork Modulation System to design the formwork sets for the project.
Careful mock-up checks for the aluminium formwork sets after production, as to assure that the product sets were totally complete prior to delivery to the project site.