Aluminium Formwork System
Aluminium formwork is mainly used to solve the formwork construction of the cast-in-place concrete structure in housing buildings, offering advantages such as shortening the construction period and eliminating the need for plastering. By using aluminium formwork, it is possible to complete the pouring construction of one floor in 3 to 5 days.
Aluminium formwork is a new generation of construction formwork after timber and steelformwork, Aluminium alloy profile is the main material and it is made into formwork throughmachining, welding, and other processes, which is suitable for concrete engineering. Aluminiumformwork can be assembled freely according to different structures and sizes. its design andapplication is the innovation of formwork technology.
Flat-Tie System
The formwork with the flat tie reinforcement systemis free of drilling, with the good vertical casting effectand fewer installation accessories, reducing the installation workload of workers, which is more in line with the use habits of 、workers in different countries.
Tie-Rod System
The forming effect of the tie-rod reinforcement systemis very smooth. The tie-rod reinforcement systemis more suitable for the refurbishment project with different structures and the project with wall thickness structures larger than 400mm.